MORE ( FLOW METER & LEAK STOP)

Contact Us

Flowway Industry&Trade Co., Ltd.

E-mail:claudielove@126.com

P.C.:264003

Add:17 Xiulin Rd.

Laishan,Yantai,Shandong, China

MORE ( FLOW METER &

LEAK STOP

LEAK STOP

Details :
PART NO.

Size(mm)

Tube OD

Tube OD

SBE-LS10

45×45×45

1/4〞tube

1/4〞tube


THEORY

There is paper string to close ball valve in case of leak. When leak is detected,paper string breaks first,ball valve which is held by paper string moves to the close position. Same as valve were closed by hand No battery or electric needed. Simple installation It is available to install inside or outside of new or existing purifier. Fracturing time of paper:Min 5sec~Max 60sec.

Home   |  About Us   |  Certificate   |  Product   |  News   |  Message   |  Contact   | 

© 2014Flowway Industry&Trade Co., Ltd.All Rights Reserved   Postcode: 264003   Address: 28 Xiulin Rd, Laishan R&D,Yantai,Shandong,China